We provide all details of the tank design and surrounding filtration equipment. Due to the modular design concept of the towers it is very easy to install our equipment. During the project execution, we provide all requirements and guidelines for a fast installation and start-up.

  • Ceramic flat sheet membrane - CERAFILTEC - installation 1

    Train is prepared for installation

    Civil works construction is completed; piping, valves and instrumentation are installed (scope of project partner)

  • Ceramic flat sheet membrane - CERAFILTEC - installation 2

    Step 1

    Installation of filtered water header pipe holders on left and right side of concrete walls

  • Ceramic flat sheet membrane - CERAFILTEC - installation 3

    Step 2

    Installation of air-scouring sets to be fixed by screws on concrete bottom

  • Ceramic flat sheet membrane - CERAFILTEC - installation 4

    Step 3

    Connection of installed air-scouring sets to common blower pipe

  • Ceramic flat sheet membrane - CERAFILTEC - installation 5

    Step 4

    Installation of tower position holders on the bottom of the tank

  • Ceramic flat sheet membrane - CERAFILTEC - installation 6

    Step 5

    Positioning of first module tower

  • Ceramic flat sheet membrane - CERAFILTEC - installation 7

    Step 6

    Completion of first tower line

  • Ceramic flat sheet membrane - CERAFILTEC - installation 8

    Step 7

    Repetition of tower positioning for all remaining tower lines

  • Ceramic flat sheet membrane - CERAFILTEC - installation 9

    Step 8

    Installation of sprinkler sets on top of all tower lines

  • Ceramic flat sheet membrane - CERAFILTEC -installation 10

    Step 9

    Connection of installed sprinkler sets to common sprinkler pipe

  • Ceramic flat sheet membrane - CERAFILTEC - installation 11

    Step 10

    Mounting of filtered water header pipe couplings

  • Ceramic flat sheet membrane - CERAFILTEC - installation 12

    Step 11

    Installation of first filtered water header pipe, connection to each tower, fixing on wall holders and coupling

  • Ceramic flat sheet membrane - CERAFILTEC - installation 13

    Step 12 (installation completed)

    Repetition of filtered water header pipe installation for all remaining tower lines

  • Ceramic flat sheet membrane - CERAFILTEC - installation 14

    Tests and process start-up

    Leakage test: tank filled with water and bubble point test to check for leakages; simulation of all process sequences

  • Ceramic flat sheet membrane - CERAFILTEC - installation 15

    Ready for operation

    Train can be put into operation as per projection

     

Ready for a Quote?

Contact us for a ceramic membrane design or for a commercial proposal.
CONTACT US
chevron-up
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram